USD

Cart

Loadding...
Home>Repair Tools>Tools Brand>MIJING>MiJing C20 For iPhone X-15 Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame Tester
MiJing C20 For iPhone X-15 Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame Tester

MiJing C20 For iPhone X-15 Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame TesterItem NO.: SR-3348

US$ 62.85
Color:
For iP 11 11 PRO MAX
US$ 62.85
- +
For iP X XS XS MAX
US$ 62.85
- +
For iP 12 12 PRO MAX
US$ 91.45
- +
13 series
US$ 125.75
- +
14 series
US$ 105.75
- +
15 series
US$ 105.75
- +
Quantity: 0 , Subtotal 0
Adding to cart succeed
MiJing C20 For iPhone X-15 Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame Tester
color:red,size:xxl
Subtotal: US$ 0
View My Cart

Copy and share this link on social network or send it to your friends

Copy
  • MiJing C20 For iPhone X/XS/11 Pro/12 Pro Max Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame Tester
    • Product Name: MiJing C20 For iPhone X-15 Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame Tester
    • Item NO.: SR-3348
    • Weight: 0.3 kg = 0.6614 lb = 10.5822 oz
    • Category: Repair Tools > Tools Brand > MIJING
    • Creation Time: 2024-07-11

    MiJing C20 For iPhone X/XS/11 Pro/12 Pro Max Motherboard Function Testing Fixture Logic Board Upper/Lower Middle Frame Tester

    Notice :The tester don`t include the mobile phone mianboard

    Feature:

    Easy to use, connect the upper and lower motherboards for testing/repair, avoid problems after installation, increase maintenance speed
    Check in advance to avoid duplicate disassembling and breaking the motherboard
    Small size, easy to carry.


    Operational Process:
    1, Prepare

    Power On/Off Cable*1
    Power Line*1
    LCD Test Cable*1
    Screen*1
    Main Board*1

    2, Decomposition iPxone x/xs/xsmax Middle Layer simply equipped the test fixture.

    3, Install: Put in the lower main board, put on the pin board, put the top board in, and then cover the test rack.

    4, The first way to connect the screen line,boot,power cord or battery test ink success or not. The second way is to connect the end plug on the base of the first method to implement the brush function.